Just some (eg. without the sonar sensor arrays) of the components of an electricity hungry AN/BYG-1 combat system. See this image much larger and readable here.
---
AIP, LIBS AND COMBAT SYSTEM COMMENTS
"I doubt that an US combat system would today overload an AIP.
Just compare the computing power used in 1990 https://upload.wikimedia.org/wikipedia/commons/d/d8/Macintosh_classic.jpg(100 Watt for 8 MHz Motorola 68000 with 16/32-bit) and what we have today
https://upload.wikimedia.org/wikipedia/commons/e/e8/Imac_16-9.png(400 Watt for 4.0 GHz i7-6700K with 64/64-bit).
https://upload.wikimedia.org/wikipedia/commons/e/e8/Imac_16-9.png(400 Watt for 4.0 GHz i7-6700K with 64/64-bit).
((Power usage is related to the display. The 21.5-inch display version needs just 300 Watt))
The Siemens Fuel Cells provide about 300 kW for a Type 212 submarine. Enough power for 1.000 iMacs with a "small" display.
Main application for computers on submarines are FFT-calculations to provide the nice water fall diagrams. Today's computer hardware has not only a 500 times faster clock speed. It also provides 4 CPUs and 64 bit data (another factor 8 for 32-bit audio - normal computer sound system just use 16 bit).
So the computers are about 4,000 times faster today. I doubt that an AN/BYG needs the same power than in 1990. GDs system was even installed on Brazilian Type 209 submarines just powered by Lead-acid Batteries (LABs).
The 300 kW on Type 212 were provided by 9 FCM 34 fuel cell modules with a power output of 34 kW each at 630 kg weight (due to the fact that 1 cell is reserve the actual power output is 270 kW). The FCM 120 modules with 120 kW weight 930 kg. So power output according to weight was increased by a factor of 2.
The first methanol reformer for submarines was tested in 1999:
https://web.archive.org/web/20050425213817/http://www.komo.uni-kiel.de/martech/workshop/AG3-Pomm.pdf
Fuel cells for submarines are mature systems. How many commissioned submarines use LIBs today? The three Japanese submarines will be commissioned far too late to make a decent decision in 2016. [Pete Comment - nevertheless LIBs are planned for the German designed future 216s https://de.wikipedia.org/wiki/U-Boot-Klasse_212_A#Klasse_216 ]
Here on page 10 is a nice scaled and dimensioned drawing:
http://vzb.baw.de/publikationen/kolloquien/0/Vortrag_7_Brennstoffzellenantrieb.pdf
You can see how big the complete fuel cell system is and how the engine compartment (to the left) is quieted on Type 212 submarines - a double hull around the diesel engine compartment. Just the modules encircled with red and yellow belong to the FC (German: Brennstoff-Zellen - BZ) system. The area marked green is a regular switchboard necessary on every type of submarine (just ask for further translations)."
Providing a different view is Anonymous on January 16, 2016 commented:
"The 300 kW AIP module may or may not be sufficient without seeing the hardware architecture of AN/BYG.
I understand that the AN/BYG is a fault tolerant multi core multi processor parallel computing architecture. So if each of the node has 8 quad core Xeon or Itanium processors and say there are 512 nodes, the power consumption can get big very fast.
Essentially it is the same architecture as found today in big critical data centers, quite a bit more sophisticated than 1000 iMACs, much more like a supercomputer."
PETES COMMENT
It needs to be remembered that Combat System is just part of a submarine's "Hotel Load". Added to Hotel Load is Propulsion Load. So total reliance on AIP does not equal Combat System electrical demands.
While a submarine combat system may have a clock speed 1,000 times faster than say 10 years ago the software demands may have also increased greatly. This is similar to software demands keeping pace with and steadily passing current home computer hardware storage and speed capabilities.
Historically for a submarine's electrical power requirements AIP doesn't appear to have been rated as a high requirement for Australian submarines. The Collins planners could have included AIP as fitted or retrofitted. Lack of AIP has also not featured on media or official inquiry fault lists for the Collins.
However if the South China Sea may be one of the major patrol areas for Australian submarines then the rising quality of Chinese anti-submarine sensors needs to be anticipated. This boils down to an increased requirement for fully submerged operation in the South China Sea.
For a (say) 30 day operational mission in the South China Sea LIBs may not adequately or safely cover the whole period or whole speed range from (say) 4 knots to 10 knots. AIP may be needed for 4 knot operation and LIBs for 10 knots.
Meanwhile for transit from Fleet Base West (Rockingham) to the South China Sea at 10 knots (as fully submerged as possible ie. short snorting periods) LABs may well be inadequate. So LIBs may be the answer. This perhaps is making LIBs a high priority requirement in Australia's CEP.
Pete